Salted Fiber Works was engaged by the Road Development Corporation (RDC) to execute cable junction installations and pipeline network works at N. Velidhoo Island.
The project formed part of essential island infrastructure development, requiring precise coordination, durability, and compliance with operational and environmental conditions typical to Maldivian islands.
The scope of works included:
All works were carried out to ensure long-term reliability, safety, and ease of maintenance.
Working within an inhabited island environment required careful planning to minimize disruption while maintaining progress. Salted Fiber Works applied its experience in island-based infrastructure works to deliver the project efficiently and safely.
Coordination with the client and local stakeholders ensured that installations were completed accurately and integrated seamlessly into the existing utility systems.